01Industrial Piping
Fabrication and installation of industrial piping systems.
DISCUSS YOUR PROJECT →
Fabrication, installation, repair, testing and maintenance for industrial facilities.
01Fabrication and installation of industrial piping systems.
DISCUSS YOUR PROJECT →
02Installation and repair of corrosion-resistant fiberglass systems.
DISCUSS YOUR PROJECT →
03Fiberglass tank fabrication, repair and relining.
DISCUSS YOUR PROJECT →
04Thermoplastic piping, welding, lamination and joining.
DISCUSS YOUR PROJECT →
05Preventive and corrective maintenance for industrial facilities.
DISCUSS YOUR PROJECT →
06Pressure testing, leak detection and system inspection.
DISCUSS YOUR PROJECT →
FIELD CAPABILITYWe fabricate and install skids, pipe racks, spools, flanges, valves, actuators, supports and related hydraulic or pneumatic equipment. Work can include layout, alignment, final flange make-up, torquing, hydrostatic testing and inspection.
VIEW PROJECT PHOTOS →✓ Skid-mounted fabrication and assembly
✓ Leak, crack and deterioration repair
✓ Industrial ductwork and chemical drainage
✓ Tank, piping and equipment relining
✓ Hydrostatic testing and leak detection
✓ Pumps, valves and component replacement
The team works with a broad range of corrosion-resistant thermoplastics. These values organize the material data supplied by the client for project planning and field reference.
| Thermoplastic | Fusion temp. °F | Fusion temp. °C | Typical welding temp. °F | Welding temp. °C |
|---|---|---|---|---|
| FEP (MAXAR) | 500–530 | 270–277 | 650–725 | 343–385 |
| CPVC | 230 | 110 | 550–660 | 280–348 |
| PVC | 230 | 110 | 500–550 | 260–290 |
| PVDF (KYNAR) | 311–338 | 155–170 | 650–680 | 343–360 |
| PP | 390–420 | 198–215 | 550–600 | 290–315 |
| PE | 400–430 | 204–221 | 500–600 | 260–315 |
| ECTFE (HALAR) | 460–470 | 237–244 | 520–620 | 271–330 |
| PTFE | 620–630* | 326–333 | 650–750 | 343–400 |
| CTFE | 410–420 | 210–216 | 450–550 | 232–290 |
| PFA | 575–590 | 298–310 | 675–750 | 357–400 |
| ETFE | 520–530 | 271–278 | 675–710 | 357–376 |
* Reference values vary by equipment, material specification, wall thickness and approved procedure. Final settings must follow the manufacturer, project specifications and qualified welding procedure.
Every scope is different, but the first steps should always be clear.
We review the location, system, problem and schedule.
Materials, access and field requirements are identified.
Our team completes the approved fabrication, repair or installation.
The completed work is checked before closeout.
Call us to discuss the site, scope and schedule.